10 - Territorial and infrastructural networks of the"obus" plan
full picture
Copyright©FLC

11 - The Central Administrative District at the feet of the Casbah, near the Admiralty, directly linked with the hills of Fort lŽEmpereur
full picture
Copyright©FLC

12 - The plan seeks to superimpose very few signs to the existing pattern
full picture
Copyright©FLC
 
.
.
.
 

13 - Model showing the strong differences in height
full picture
Copyright©FLC

14 - Project B
full picture
Copyright©FLC

15 - The motorway on the roof
full picture

Copyright©FLC
 
.
.
 

16 - Sketch illustrating the principles of the last plans: the proposed center changes its position, between the european and the arab quarters
full picture
Copyright©FLC

17 - The new idea reduces the scale of the infrastructure and of the buildings, and foresees the creation of specialised satellite towns
full picture
Copyright©FLC

18 - The new Community Center is, geometrically, the center of the town, with a maximal allowed radius of 4 km
full picture
Copyright©FLC